A field visit to the work sites for replacing and renewing the external and internal lines of the Jaraya furnace stationMian/News/A field visit to the work sites for replacing and renewing the external and internal lines of the Jaraya furnace station
A field visit to the work sites for replacing and renewing the external and internal lines of the Jaraya furnace station

DATE:  2019-03-13 03:17:02 PM

شركة مياة الشرب بالاسكندرية - البوابة الالكترونية
Loading...


Today, Eng. Ahmed Jaber Shehata, Chairman of the Board of Directors and Managing Director, and with him Eng. Mr. Rayan, Head of the West and Coast Production and Distribution Sector, made a field visit to the work sites for replacing and renewing the external and internal lines of the Furn Al-Jaraya station and following up on the process of relocating the water lines on the Mahmoudiyah axis for the development areas in Bashayer Al-Khair. 1 At Ragheb Bridge and the opposite side in front of the Coptic Catholic Church of Our Lady, the work of installing a 500-inch and 12-inch line began as an alternative to the lines conflicting with the Mahmoudiyah Canal Development Project.