The company's stations and cranes

DATE:  2018-08-08 01:32:16 PM

شركة مياة الشرب بالاسكندرية - البوابة الالكترونية
Loading...


Graph of the quantity of pure water produced during three years

A diagram of the design capacity of the stations


 

 

1- Al-Mamoura station

 

The station was established in 1911 for the purpose of serving the coastal region - the city of Alexandria, starting from Al-Montazah to Abu Qir Bay. The station received a degree of modernization and development of the production units.

And the implementation of new projects and the application of modern technology, especially the monitoring and follow-up of the production stages (SCADA). - and ISO 14001:2015 -

* Design capacity (m3/day): 240,000

*Quantity of pure water during the year 2019/2020 (million m3): 49.7

* Service areas: part of (Second Montazah District - Buhaira Governorate)

 


 

2- Al-Seyouf station

 

The urban space of the city of Alexandria extended to the east, and the water company had to work to meet the required water needs, and accordingly, it established a station next to the Mahmoudiya water canal located in the Awaid area - Mahmoudiya Canal Road, with a total area of ​​66 acres in 1934, and the station obtained the ISO 9001-2015 certificate, and the station obtained the TSM certificate and ISO 14001-2015 and OHSAS18001:2007

* Design capacity (m3/day): 840,000

*Quantity of pure water during the year 2019/2020 (million m3): 275.8

* Service areas: Part of (Second Montazah District - Sharq District - First Muntazah District - Buhaira Governorate)

 


3- Eastern station

It is the oldest of the company’s stations. The establishment of the station dates back to the year 1860, when a French company was formed to exploit the concession it obtained from the Egyptian government to supply the city of Alexandria with its needs of pure water. The construction of a water tank above Kom El-Dikka area, and the station obtained ISO 9001-2015, ISO 14001-2015, and OHSAS18001:2007.

* Design capacity (m3/day): 510,000

*Quantity of pure water during the year 2019/2020 (million m3): 124.01

* Service areas: part of (Eastern District - Central District - Al Gomrok District - West District)


 The picnic station-4

 

The station was established in 1995 to serve the increasing population expansion, especially in the Smouha area. The area of the station is 17,898 square meters. The station enjoys the presence of many units in it, as it contains the production units of the station with the Italba system and the tanks with them under the corridors due to the narrow space. It also contains the buildings necessary to operate the station from the administration building, laboratories and workshops Which serves the station and the rest of the stations, as well as the central laboratory of the company occupies two floors furnished with the highest and latest technological and technical level.

* Design capacity (m3/day): 200,000

  *Quantity of pure water during 2019/2020 (million m3): 12.4

* Service areas: part of (Sharq district - Central district - Al-Amriya district)

   


  

5-Al-Jaraya Furnace Station

The station was established in 1964 with a design capacity of 25 thousand cubic meters per day, during the implementation of the five-year plan projects (1960-1965) in order to meet the needs of water suitable for minimal use in the areas located west of Alexandria. The station witnessed development in the production units, and the station obtained the ISO 9001-2015 certificate. TSM, ISO 14001-2015 and OHSAS18001:2007 certification

* Design capacity (m3/day): 50,000

*Quantity of pure water during the year 2019/2020 (million m3): 9.07

( Service areas: part of (Gharb district

 


6- Al-Mansheya station 1

The station started its production in 1976 with a quantity of 100,000 m3. After that, expansions continued to increase the design capacity of the station and meet the growing needs in west Alexandria. The station is located on a drinking water canal (a canal belonging to the company). The station is certified by ISO 9001-2015, ISO 14001-2015 and OHSAS18001:2007.

* Design capacity (m3 / day): 380,000

*Quantity of pure water during the year 2019/2020 (million m3): 123.3

* Service areas: part of (Wasat District - Al-Jumrok District - West District - Al-Ajami District - Al-Amriya District - Burj Al-Arab Center and City)

 


7- Al-Manshia station 2

 

The station was established in 2013 with a design capacity of 240,000 m3 per day for the purpose of serving the areas of Abis and Merghem, strengthening the pressures in these areas and reducing the load on neighboring stations within the strategic plan of the company. : 2007

* Design capacity (m3/day): 240,000

*Quantity of pure water during the year 2019/2020 (million m3): 69.2

* Service areas: part of   (Sharq District - Al-Amriya District - Burj Al-Arab Center and City - Buhaira Governorate)


8- Mariout Station 1

 

 

On November 30, 1968, Republican Decree No. 1639 of 1968 was issued to transform the Alexandria Water Company into a public body called the General Authority for Alexandria Water Utility, which is concerned with the management and exploitation of the facilities and facilities attached to it, on which the Alexandria Water Company was based. Mariout water station and its networks were added to it, and the station obtained a TSM certificate.

* Water source: Nubaria Canal

* Design capacity (m3/day): 510,000

*Quantity of    pure water during 2019/2020 (million m3): 164.2

* Service areas: part of ( Al-Amriya District - Burj Al-Arab Center and City - Buhaira Governorate)

  

9- Station K40 (Marriot 2)

The station was implemented under the supervision of the New Urban Communities Authority, mainly to serve the city of Burj Al Arab and the North Coast. The station started its production in 1988, with a design capacity of 86,000 cubic meters per day, and the area of the station is 343,000 square meters. Expansion projects were implemented at the station to increase the design capacity to meet the increased demand for water, and it was handed over to the Development Agency. The new urban communities for the months of March and April 2018. The company is currently operating and maintaining the station. The station obtained the ISO 9001-2015 certificate. The station obtained the TSM, ISO 14001-2015 and OHSAS18001:2007 certificates.

* Water source: Mariout Canal

* Design capacity (m3/day): 636,000

*Quantity of pure water during the year 2019/2020 (million m3): 157.4

* Service areas: part of   (Al-Amriya District - Burj Al-Arab Center and City - North Coast - Matrouh Service Area)

 

 

 


10- Flowers station

The station operates with fiber membrane technology. The station's land area is 1200 square meters, with a design capacity of 5500 square meters / day. It joined the service in 2013.

* Design capacity (m3/day): 5500

*Quantity of pure water during the year 2019/2020 (m3): 0.595

* Service areas: part of (Burj Al Arab Center and City)

 

Stations of the Drinking Water Company in Alexandria

the number

station name

the address

phone

design power

thousand m3/day

1

 Mamoura

Tabiya Rashid Road - Mamoura

5621506

240

2

swords

The returns

5013474

840

3

east

Water Wabour - behind Bab Sharqi section

4289048

510

4

Picnic

Nozha Airport - Agricultural Road

3817670

200

5

Jaraya oven

Karmouz - Mahmoudiyah Canal Road

3618046

50

6

Mansheya 1

In Front Of Shooting Club - Moharram Bey

3815355

380

7

Mansheya 2

Abis - next to the flower village

9558751

240

8

Mariout 1

Km 81, Alexandria/Cairo Desert Road-Nubaria

(045)2316464

510

9

K 40

(Marriot 2)

Burj Al Arab, Km 40, Alex/Cairo Desert Road

9681260

566

10

The flowers

Sugar beet - Nasser project

----

5.5

Total

3317

 

A map showing the company's stations and cranes

 
A statement of the levers of the Alexandria Drinking Water Company