The weekly news report of the Alexandria Drinking Water Company
Events and field follow-ups in the first week of Ramadan
Report summary
1- Studying how to migrate water lines to keep pace with the ongoing expansions in Kilo 21 Square
2- Directing the operating aspects of Rafi Abu Youssef during the ongoing expansions
3- Field visit to the 6th of October branch
4- A meeting with the director of the October branch to inspect the status of collections and subscriptions and develop new policies for work during this critical period.
5- Distribution of preventive supplies to protect against the Corona virus to workers at the October branch
6- Follow up on the operation of the Abu Talat crane
7- Visit the Al-Ajami Administrative and Engineering Branch
8- A meeting with the General Manager of the West Branches and the Director of the Al-Ajami Branch to inspect the work situation during that critical period
9- Follow up on the replacement and renovation of the Akra gates
Inside the Mahmoudiyah lift to improve the production of the Sharqi drinking water station
10 - Follow up on the rehabilitation work of the Sharqi station to obtain the TSM
11- Following up on the relay work on Qatar Line 1500, which conflicts with the establishment of the bases of the Bahij Bridge
12- Inspection and examination of a break in a water line in front of Petrojet Company immediately upon arrival of the reporting signal, heading to the Bahij area
13- Honoring Engineer/ Ahmed Gaber and the team of sterilization and disinfection campaigns in the fields of Alexandria Governorate for their efforts in spraying and disinfecting Alexandria Stadium.