The head of Alexandria Water follows up on the work of the Decent Life Initiative projectsMian/News/The head of Alexandria Water follows up on the work of the Decent Life Initiative projects
The head of Alexandria Water follows up on the work of the Decent Life Initiative projects

DATE:  2022-06-04 01:52:43 PM

شركة مياة الشرب بالاسكندرية - البوابة الالكترونية
Loading...


The head of Alexandria Water follows up on the work of the Decent Life Initiative projects

Engineer Ahmed Gaber, President of the Drinking Water Company in Alexandria, conducted a field tour to follow up on the implementation of the replacement and renewal works of a 700 mm line with a length of 650 meters on Umm Zaghyou Road, and to ensure that work is being done according to the scheduled time rates.

He also inspected the drinking water lifters (the 38 kilometer coastal lifter - the Burj Al Arab coastal lifter - the railway lifter - the old Burj Al Arab lifter - the new Burj Al Arab city lifter), which increase water pressure in the service areas.

He visited the site of implementing the 500 mm outlet from the 1000 mm concrete line at the new 38 km coastal lifter to feed the areas (Abu Sir - Al Ramli - Halis), which is being implemented within the projects of the Presidential Initiative, Hayat Karimah. He also inspected the railway water lifter, which includes the implementation of an outlet and expulsion lines to connect them. On the web.

He concluded his tour by following up on the work of the national projects established on the Hassan Allam Road linking the old Burj Al Arab and the coast, which is the relaying of 1000 mm lines and two runners of 1000 mm and 12 inches for each run.