A field tour by engineer Ahmed Gaber, head of the Alexandria Water Company in the South sector.
Engineer Ahmed Gaber, head of the Alexandria Water Company, reviewed the project to divert the 1000 mm line (Yasser Zaghloul) with a length of 400 meters due to its conflict with the construction of the U-turn bridge west of the desert road in the Amriya area.
On the same extension and the same line (Yasser Zaghloul) went to the Real Estate area to modify the route of the same line because it conflicted with the expansion of the desert road.
It was followed by passing through the warehouses at Kilometer 59, then the tank at Kilometer 58, which is located within the Decent Life projects, then Kilometer 58 on the Cairo-Alexandria Desert Road - the entrance to the candles - which is the process of connecting the 1000 mm line feeding the city of Nubariya to a 1000 mm high density polyethylene line - directed payment under the road. The desert.
As well as extending and strengthening a line 12 inches long
10 km in Abu Al Matamir Center as part of the Decent Life initiative to deliver water to deprived villages and solve the problems of weak pressure and citizens’ complaints in the region.
On the sidelines of the tour, he went to the Mariout branch and customer service center (1), where he ordered removing obstacles for citizens and ending their services quickly.
He ended his tour by passing by the kilometer 40 station, where he passed by the wards, galleries, and filters to follow up on the replacement and renewal work therein. He also stopped by the station’s laboratory to check on the quality of the water.
It is worth noting that the kilometer 40 station operates with a design capacity of 566,000 cubic meters/day and serves parts of (Al-Amriya neighborhood - Burj Al-Arab city center and city - North Coast - Matrouh).