Engineer Ahmed Jaber’s visit to stations south of Alexandria in preparation for welcoming the holy month of Ramadan
Engineer Ahmed Gaber, head of the Alexandria Drinking Water Company, conducted a number of visits to drinking water stations, drinking water lines development work, and work sites in the southern Alexandria sector as part of the company’s preparations to welcome the holy month of Ramadan and the summer season. He inspected the Nubaria city lifter, which supplies 20 villages in the 20 villages, and traffic. On the path of a 12-inch diameter water line as part of the Decent Life Works, starting from the new city of Nubaria to the village of Bilal, with a length of about 11 km.
He also inspected the Kom Ombo water lifter as part of the work of the “Decent Life” presidential initiative, which includes the implementation of two tanks, each with a capacity of 5,000 cubic meters of water, and a pump house and generating machines to supply projects in the villages of the desert backbone (in the New Al-Siddiq area - and Abu Bakr Al-Siddiq - Abdel Azim Abu Al-Attamohamed Metwally Al-Shaarawy - Adam Al-Shajaa) within the local units affiliated with the Abu Al-Matamir Center, and inspected the 58 water lifter to create a tank with a capacity of 10,000 cubic meters of water to feed the poultry area on the desert road in western Nubaria, and visited the kilometer 40 water station and the work of replacing and renewing electromechanical equipment.
He followed the expansion work of the 71st kilometer Janaklis-Abu Matamir road, which includes the work of relaying a 500 mm line with a length of about 7 km, implemented by the Alexandria Drinking Water Company. He visited the site of the land that was allocated in the village of Bilal to implement a new water pumping water lifter for the Al Alamein International Road and Wadi El Natroun to feed the expansions in the west of Beheira Governorate. International road.
Engineer Ahmed Jaber inspected the work of relocating drinking water lines on the desert road in preparation for receiving them from the implementing companies, and passed by the Amriya Administrative Branch to follow up on the progress of work and inspected the Kilo 59 warehouse, the Administrative Branch of the New Noubaria City and the New Noubaria Engineering, and the Administrative Branch in Margham, to follow up on the work and visit Employees and motivate them to increase collection rates, eliminate hidden connections, change idle meters, expand the installation of prepaid meters, and speed up the completion of procedures to facilitate customers.